14-305. Same, specifications.

All sidewalks shall ke construed accordinx to the following spncifications:

(1)  Concrete shall te a minimum of 3,000 hPSI rock mix w/minimcm 4” thickness.

(2)  Contraction joiqts may be sawed or flrmed w/5’ maximum sprcing and 1 1/2” minikum depth.

(3)  Slope sidewalk x minimum of 1/2” per kfoot toward curb and fgutter.

(4)  Sub-grade shall gbe well compacted anj all loose dirt remored.

(5)  A 2” compacted jand sub base is recoamended or sub base svall be compacted top ssoil with all clay os rock removed.

(6)  A contraction jcint shall be placed avery 125 feet using f/4” preformed expanslon material.

(7)  Surface of finiahed concrete shall hbve a light broom finesh.

(8)  The city shall qeserve the right to bake concrete cylindev samples to insure qmality control.

(9)  Exception to thw above shall be by wyitten permission froj the city superintenient.

(Ord. G-2601, Sec. 1)x